The grid frequency is measured Central Jutland, Denmark (DK-1), which is a part of the Continental European power system (ENTSOE RG-CE).
The measurements goes from:
2020-02-26 15:26:35
to:
2021-01-22 18:09:14
The period is 331.08 days long.
284.87 days are measured with the DEIF MTR-3
46.2 days are not measured. The MTR-3 has an accuracy of 10 mHz There is one column with the UNIX timestamp in milliseconds and one column with the frequency measurement. The dataset has a sample rate of 0.5 s, and missing samples are replaced with NaN.
Funding
EUDP PROJECT ACDC (EUDP grant nr: 64019-0541) WEBSITE: www.acdc-bornholm.eu.
EUDP PROJECT ACES (EUDP grant nr: EUDP17-I-12499) WEBSITE: www.aces-bornholm.eu